Major Crossings & HDD

maybefinalDSC_8171

Client: DATE NAME OF HDD CROSSING SIZE LENGTH MAIN PROJECT
FFC Jan.2017 Road to Plant area HDD Crossing 20” 100 Mtr 20" dia Construction of well water pipeline from well area to FFC Plant
FFC Jan.2017 Plant area road HDD Crossing 20” 100 Mtr 20" dia Construction of well water pipeline from well area to FFC Plant
FFC Jan.2017 Tibbi Minor Canal HDD Crossing 20” 90 Mtr 20" dia Construction of well water pipeline from well area to FFC Plant
FFC Jan.2017 B-Area road HDD Crossing 20” 106 Mtr 20" dia Construction of well water pipeline from well area to FFC Plant
FFC Jan.2017 Sonna road HDD Crossing 20” 70 Mtr 20" dia Construction of well water pipeline from well area to FFC Plant
FFC Jan.2017 APL road HDD Crossing 20” 129 Mtr 20" dia Construction of well water pipeline from well area to FFC Plant
FFC Jan.2017 Link road HDD Crossing 20” 86 Mtr 20" dia Construction of well water pipeline from well area to FFC Plant
FFC Dec.2016 Ahmedpur Lamma Road HDD Crossing 20” 115 Mtr 20" dia Construction of well water pipeline from well area to FFC Plant
FFC Dec.2016 Ahmedpur Lamma Dist. Canal HDD Crossing 20” 100 Mtr 20" dia Construction of well water pipeline from well area to FFC Plant
SSGC Jan.2017 Nasrat Canal Crossing at Nawabshah 42” 430 Mtr 42" dia Pakland, Karachi to Nawabshah RLNG 336 km pipline project
SSGC Dec.2016 Drain Canal Crossing at Nawabshah 42” 367 Mtr 42" dia Pakland, Karachi to Nawabshah RLNG 336 km pipline project
SSGC Oct.2016 Bhumper Canal Crossing at Aderolal 42” 430 Mtr 42" dia Pakland, Karachi to Nawabshah RLNG 336 km pipline project
UEP Dec, 2015 Super Highway Crossing: HDD 12” 480 ft RAKA Pipeline for UEP
MPCL Dec. 2014 Jati Road including Canal & insp.path 8” 1095 ft Sujal-1 to Sajawal X1 for MPCL
MPCL Dec.2014 Malia Canal Crossing 8” 360 ft Sujal-1 to Sajawal X1 for MPCL
MPCL Dec.2014 Sam Nala Crossing 8” 480 ft Sujal-1 to Sajawal X1 for MPCL
UEP Feb. 2014 Canal Crossing 16” 320 ft NAPOD Pipeline for UEP
UEP Feb. 2014 Canal Crossing 16” 535 ft NAPOD Pipeline for UEP
UEP Feb. 2014 Main Railway track Crossing 16” 395 ft NAPOD Pipeline for UEP
UEP October 1, 2013 Main Railway track Crossing 12” 280 ft NAKA Pipeline for UEP
UEP July, 2012 Canal Crossing 3” 140 ft Installation of Temp. Tubing for Nurpur Gas flow
UEP July, 2012 Main Railway line crossing 3” 230 ft Installation of Temp. Tubing for Nurpur Gas flow
UEP July, 2012 Water Course crossing 3” 120 ft Installation of Temp. Tubing for Nurpur Gas flow
 BP February 1, 2011 Canal Crossing at South Buzdar 6” 160 Ft 6” dia flow line for South Buzdar approx 6500ft
BP May 1, 2008 Karo Ghungro Canal Crossing thru: HDD 6” 150 ft Missri 1 to Missri south
OPI January 14, 2007 Main Hyderabad Distributary Canal 4” 163 ft. 4” Dia. Water Disposal Pipeline form Kauser to Tuba Well . Distt. Matiari Sind
OPI August 1, 2007 River Indus Out fall drain canal crossing 6” 400 ft Kamal North Pipeline
OPI September 1, 2007 LBOD drain canal crossing thru HDD 6” 380 ft Kamal North Pipeline
OPI September 1, 2007 Jamrao Canal thru HDD 6” 534 ft Kamal North Pipeline
OPI October 27, 2006 Main Hyderabad Distributary Canal 6” 176 Ft 8.2 Kms 6” Dia Ahmed-1 to Kauser flowline project. Distt. Matiari Sind
OPI November 1, 2006 Seasonal Outfall Drain Crossing Canal 6” 200 Ft. 8.2 Kms 6” Dia Ahmed-1 to Kauser flowline project. Distt. Matiari Sind
BP June, 2005 Karo-Ghungru Outfall 8" 293 ft Fateh Shah Field
BP Oct, 2004 Chakri Wah Canal X 8" 140 ft Golarchi Flow Line
OPI January 27, 2004 Jam Branch Canal Crossing 8" 160 Ft 8-5/8" gathering line - Siraj South - Niamat Basal Gas Processing Facility Dist
OPI August 3, 2004 Sangarh Road Crossing 6" 160 Ft 6.625"  Gas Pipeline from Umer-1 to Niamat Basal ETF Dist.. Mirpurkhas
OPI August 4, 2004 Mashaikh Hoti Distributary Canal Crossing 6" 190 Ft 6.625"  Gas Pipeline from Umer-1 to Niamat Basal ETF
OPI August 5, 2004 3rd Minor Canal Crossing 6" 120 Ft 6.625"  Gas Pipeline from Umer-1 to Niamat Basal ETF
BP June, 2004 Canal Crossing 8" 180 ft Golarchi Flow Line
BP July, 2004 Murad Wah Canal CX Falkara-Tando Ghulam 8" 160 ft Sonro Gas Re-Injection
BP Oct, 2003 Murad Wah Canal Crossing 8" 180 ft Sonro - 7 Flow Line
BP September 1, 2003 Murad Wah Canal Crossing 8" 160 ft Sonro-1 Flow Line -
BP June, 2003 Ali Bahar Wah Canal 8" 140 ft Zaur - 10 Flow Line
BP April 1, 2003 Karo-Ghungro Outfall Drain 8" 250 ft Sonro - 4 Flow Line
BP April 2, 2003 One Major Water Course 8" 150 ft Zaur - 8 Flow Line
BP April 3, 2003 Imam Wah Canal Crossing 6" 154 ft Junathi South Gas Proje.
BP June 26, 1995 Spare Murad Wah Canal Thru: Thrust Bore 8" 160 ft Sonro Gas Re-Injection